Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Burjeel puts secure connectivity at the heart of patient care with HPE Networking

    November 24, 2026

    SABIC participates in the 20th Annual GPCA Forum, highlights the growing importance of chemicals in shaping the future

    November 24, 2026

    Why Sun Siyam should be on your UAE National Day travel radar

    November 24, 2026
    Facebook X (Twitter) Instagram
    Riyadh Week
    • Home
    • KSA
    • Business
    • Technology
    • Sports
    • Lifestyle
    Facebook X (Twitter) Instagram YouTube
    Riyadh Week
    Home»Sports»NASA begins final checks before planned launch of historic moon mission
    Sports

    NASA begins final checks before planned launch of historic moon mission

    Editorial TeamBy Editorial TeamApril 2, 2026
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link


    CAPE CANAVERAL — The countdown is under way at Kennedy Space Center for the liftoff of Artemis II, which will send four astronauts around the moon and back in the first manned lunar mission since 1972.
    After a mission management team meeting on Monday, NASA Associate Administrator Amit Kshatriya said Artemis II is ready for launch on Wednesday.
    At 6:24 pm EDT (22:24 GMT) on Wednesday, a two-hour window will open for the Artemis II mission to lift off from the Kennedy Space Center in Florida.
    The launch window will remain open until April 6 for two hours each day after sunset. The mission can launch only when the moon, orbital paths, weather and Earth’s rotation line up safely.
    Artemis II has faced two major delays that pushed it from its original early 2026 launch window.
    In early February, the first attempt was scrubbed after a liquid hydrogen leak was detected during a practice countdown.
    A second launch attempt in early March was cancelled when engineers discovered a helium flow issue in the rocket’s upper stage.
    Launch teams completed final preparations, including critical checks on the rocket’s four RS-25 engines and onboard systems. Non-essential personnel were cleared from the launch pad ahead of fueling operations, which began earlier in the day. Coverage started at 7:45 am EDT (11:45 GMT), with full launch coverage from 12:50 pm EDT (16:50 GMT) across multiple platforms.
    Artemis II will carry astronauts Reid Wiseman, Victor Glover, Christina Koch and Jeremy Hansen on an approximately 10-day journey around the Moon before returning to Earth.
    Although the crew will not land on the lunar surface, the mission will allow new observations of parts of the Moon not previously seen by humans, providing data that could help identify potential landing sites for future missions.
    The astronauts will test onboard systems, conduct scientific observations, and document the Moon from a greater distance than previous human missions, while collaborating with scientists on Earth.
    This will be the first time humans will get to the Moon’s neighbourhood after the last Apollo mission in 1972. The Artemis II mission will return to Earth after a 10-day journey. A successor mission, planned for 2028, is scheduled to make a Moon landing with another set of four astronauts.
    Artemis III will contribute to NASA’s long-term goal of establishing a sustained human presence on and around the Moon as a stepping stone for future missions to Mars. — Agencies

    Source: Saudi Gazette

    Related Posts

    Russia halts strikes on Ukrainian city to allow humanitarian aid

    October 27, 2026

    Ebola patient in Nigeria evacuated to Switzerland

    October 27, 2026

    Saudi domestic non-oil exports rise 8.5% in August despite overall trade decline

    October 26, 2026
    Top Posts

    QBS Software Middle East embeds AI into core operations

    April 1, 2026

    Bosnia’s Barbarez cool as ice after reaching World Cup in shootout with Italy

    April 1, 2026

    Kuwaiti tanker hit by Iranian drone attack in Dubai waters

    April 1, 2026

    UAE designers turn jewellery into meaningful Eid gifts

    April 1, 2026
    Don't Miss

    Burjeel puts secure connectivity at the heart of patient care with HPE Networking

    By Editorial TeamNovember 24, 2026

    Sageer N K, General Manager IT at Burjeel Holdings, explains how HPE Networking’s software-defined architecture…

    SABIC participates in the 20th Annual GPCA Forum, highlights the growing importance of chemicals in shaping the future

    November 24, 2026

    Why Sun Siyam should be on your UAE National Day travel radar

    November 24, 2026

    Saudi-Omani security cooperation foils smuggling of 500,000 narcotic pills

    November 24, 2026
    • KSA
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us
    2026. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.