Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Habuna Heritage Villages in Najran Stand as Testaments to Architectural Ingenuity

    September 11, 2026

    F5 deepens commitment to Saudi Arabia with AI security innovation and planned expansion of F5 global network

    September 11, 2026

    Saudi Arabia shuts East-West oil pipeline after multiple attacks

    September 11, 2026
    Facebook X (Twitter) Instagram
    Riyadh Week
    • Home
    • KSA
    • Business
    • Technology
    • Sports
    • Lifestyle
    Facebook X (Twitter) Instagram YouTube
    Riyadh Week
    Home»Sports»Saudi Arabia restores East-West pipeline to 7 million bpd after attacks
    Sports

    Saudi Arabia restores East-West pipeline to 7 million bpd after attacks

    Editorial TeamBy Editorial TeamApril 12, 2026
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link


    RIYADH — The East-West pipeline and affected energy facilities have been fully restored following the recent attacks, the Ministry of Energy announced on Sunday.

    In a statement, the ministry said the rapid recovery efforts — following the attacks on April 9— have enhanced supply reliability.

    The statement recounted that the Kingdom’s energy sector had lost approximately 700,000 barrels per day of pumping capacity through the East-West pipeline, in addition to a reduction in production at the Manifa field by about 300,000 barrels per day, and an impact on output at the Khurais field by roughly 300,000 barrels per day.

    The ministry confirmed the full restoration of pumping capacity through the East-West pipeline, now operating at approximately seven million barrels per day.

    It added that production at the Manifa field has been fully restored to around 300,000 barrels per day within a short period.

    As for the Khurais field, the ministry said efforts to restore full production capacity are still

    ongoing and will be announced upon completion.

    The ministry emphasized that the swift recovery reflects the high operational resilience and crisis management efficiency of the Kingdom’s energy ecosystem.

    Source: Saudi Gazette

    Related Posts

    Saudi Arabia shuts East-West oil pipeline after multiple attacks

    September 11, 2026

    Five killed, 67 wounded in Russian strike on Ukraine shopping mall 

    September 11, 2026

    GCC states approve tourism recovery plan, back Saudi UN Tourism candidacy

    September 10, 2026
    Top Posts

    QBS Software Middle East embeds AI into core operations

    April 1, 2026

    Bosnia’s Barbarez cool as ice after reaching World Cup in shootout with Italy

    April 1, 2026

    Kuwaiti tanker hit by Iranian drone attack in Dubai waters

    April 1, 2026

    UAE designers turn jewellery into meaningful Eid gifts

    April 1, 2026
    Don't Miss

    Habuna Heritage Villages in Najran Stand as Testaments to Architectural Ingenuity

    By Editorial TeamSeptember 11, 2026

    The heritage villages across Habuna Governorate in Najran Region stand as enduring testaments to traditional…

    F5 deepens commitment to Saudi Arabia with AI security innovation and planned expansion of F5 global network

    September 11, 2026

    Saudi Arabia shuts East-West oil pipeline after multiple attacks

    September 11, 2026

    UAE students build AI tools to cut hospital wait times, prevent unused operating rooms

    September 11, 2026
    • KSA
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us
    2026. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.