Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Saudi Arabia shuts East-West oil pipeline after multiple attacks

    September 11, 2026

    UAE students build AI tools to cut hospital wait times, prevent unused operating rooms

    September 11, 2026

    Saudi Media Academy Concludes Second Edition of Media Leaders Track in France

    September 11, 2026
    Facebook X (Twitter) Instagram
    Riyadh Week
    • Home
    • KSA
    • Business
    • Technology
    • Sports
    • Lifestyle
    Facebook X (Twitter) Instagram YouTube
    Riyadh Week
    Home»Business»Riyadh to build tunnel, 4 bridges at Thumamah–Othman intersection
    Business

    Riyadh to build tunnel, 4 bridges at Thumamah–Othman intersection

    Editorial TeamBy Editorial TeamApril 16, 2026
    Share Facebook Twitter Pinterest Copy Link LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link


    RIYADH — The Royal Commission for Riyadh City (RCRC) has announced plans to construct a tunnel and 4 elevated bridges at the intersection of Thumama Road and Uthman ibn Affan Road.

    As part of the RCRC’s Road Axes Development Program and the Thumamah–Othman bin Affan intersection development project —falling within the Ring Roads and Major Axes Development Program — this initiative aims to enhance traffic flow and improve connectivity efficiency between the main roads.

    The four main bridges, totaling 2,000 meters in length, are intended to ensure seamless connectivity between the directions without traffic.

    As for the main tunnel — at 850 meters in length — it will be accompanied by three lanes from each direction, converting the Othman Road into a free-flow corridor and ensuring uninterrupted flow along Thumamah Road.

    In addition, the service roads will have two lanes in each direction to serve neighborhoods and local activities.

    In addition to traffic flow, the RCRC expects this initiative to aid in reducing travel time, improving road safety, enabling efficient emergency responses, lowering emissions, enhancing urban landscaping, increasing investment value, and improving network connectivity.

    The RCRC has taken measures to avoid congestion during the implementation phase. The measures include establishing temporary traffic diversions to regulate and facilitate movement, Continuous on-site monitoring, installing clear directional signage to guide drivers to alternative routes, and implementing precautionary measures to enhance safety in the project area.

    Source: Saudi Gazette

    Related Posts

    Bus crash in Swiss Alps kills several Dutch tourists

    September 11, 2026

    Hong Kong’s Tiananmen vigil organizers sentenced to seven years in jail

    September 11, 2026

    Saudi minister, Bahrain’s deputy PM discuss strengthening tourism cooperation

    September 10, 2026
    Top Posts

    QBS Software Middle East embeds AI into core operations

    April 1, 2026

    Bosnia’s Barbarez cool as ice after reaching World Cup in shootout with Italy

    April 1, 2026

    Kuwaiti tanker hit by Iranian drone attack in Dubai waters

    April 1, 2026

    UAE designers turn jewellery into meaningful Eid gifts

    April 1, 2026
    Don't Miss

    Saudi Arabia shuts East-West oil pipeline after multiple attacks

    By Editorial TeamSeptember 11, 2026

    RIYADH — Saudi Arabia shut down its strategic East-West Pipeline as a precaution after it…

    UAE students build AI tools to cut hospital wait times, prevent unused operating rooms

    September 11, 2026

    Saudi Media Academy Concludes Second Edition of Media Leaders Track in France

    September 11, 2026

    Google invests €13 billion in Finnish digital infrastructure

    September 11, 2026
    • KSA
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us
    2026. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.